Construction Mythbuster Activity
Activity Aims:
To generate discussions which challenge the stereotypes and perceptions associated with Construction and the Built Environment sector.
Activity Description:
Participants are given two sets of cards:
- Myth
- Buster
They are tasked with matching the ‘busters’ to the ‘myths’ to create an industry Mythbuster.
Activity Length
45 minutes:
- 5-10 minute introduction
- 20 minutes activity
- 10 minutes discussion
All timings given are approximate.
Audience:
- All ages
Group Size
- This activity is flexible based on the size of the audience however min 2 max 4 per group is ideal.
Remember the overall size of the group/audience involved may affect timings.
Further Information:
For full details on the activity please see the Activity Cover sheet included in the documents below which provides information on:
- Preparation and Resources required
- Curriculum/Sector/Employability Skills links
- Extension Activities
Download Documents:
Construction Mythbuster Activity - All Documents
File size: 846KB
Download all documents for the Construction Mythbuster Activity.